Crewe YMCA

RefurbLeisure and Hospitality

Conversion of apartments

The project involved splitting 3 apartments, converting each one into two new rooms. These rooms each consisted of a bedroom and a shower/toilet

Alsager Community Church Cafe

RefurbLeisure and Hospitality

STAGE 1 – Entrance Area

  • Dismantle existing internal porch area, make good walls. Remove existing double doors and reinstall white aluminum double doors with

GAB Robbins

RefurbIndustrial

This was a large project involving getting 2 large industrial units (units 22 and 23) back to a habitable state after being damaged in a fire.

Cloughwood Community School

BuildSchools and Academies

The school gained funding from Sport England to update their sports facilities. This included the conversion of an existing garage to additional changing facilities, an extension to

Winsford High Street Primary School

BuildSchools and Academies

Installation of wet room floor & drains. Provision for 6 cubicles with showers and closed coupled toilets. All appropriate plumbing, electrics and new boiler to be fitted.