The Project

Installation of wet room floor & drains. Provision for 6 cubicles with showers and closed coupled toilets. All appropriate plumbing, electrics and new boiler to be fitted. Same works repeated for girls changing room.

Requirements:

  • Taking up floor to suitable depth.
  • Building & plastering store room.
  • Installing wet room floor & drains.
  • Fitting electric hand drier fitted in vanity area.
  • All appropriate plumbing, electrics and new boiler fitted.
  • Tile walls in shower/toilet areas. All other walls painted.
  • Privacy film was fitted on windows.

“We opted for Construction Linx as contractors due to overall value, and an existing relationship we have cultivated over previous jobs. We had faith in the quality of their work and their appreciation of the specific requirements of our school.”

Problem Solved

All works had to be completed in a very strict timeframe during the spring school holiday. Extended hours worked to ensure facilities were finished after a significant setback in the materials supply chain.